发明名称 EXCAVATION WORK OF TUNNEL
摘要 PURPOSE:To make it possible to simultaneously excavate a main tunnel as well as a preliminary tunnel. CONSTITUTION:A preliminary tunnel 3 is excavated at the outside of an expected excavating section of a main tunnel so that a part thereof sticks out and long size materials 6 such as electric wires, communication lines, air ducts, water pipes, etc., necessary for digging the preliminary tunnel are inserted in the protrusion and further, a shelter 10 protecting the long size materials from the impulse of blasting is provided therein as well. Hence, the long size materials 6 can be surely protected when blasting for expanding to the main tunnel 1. In this way, time preliminary tunnel can be excavated regardless of the expanding excavation of the main tunnel. Since the expanding excavation of the main tunnel can be carried out without transferring the long size material, excavation of the preliminary tunnel and expanding excavation of the main tunnel can be easily and safely conducted at the same time. Accordingly, the whole construction period can be greatly reduced.
申请公布号 JPH06137062(A) 申请公布日期 1994.05.17
申请号 JP19920289113 申请日期 1992.10.27
申请人 SHIMIZU CORP 发明人 WADA TOSHIHIKO;IZUMITANI YASUSHI;AOKI YOSHIKIYO;OTSUKA MASAYUKI;FUKUDA KAZUHIRO;ISHIZAKI HIDETAKE;KAZAMA HIROSHI;OBARA YOSHIYUKI;SUGANUMA YOSHINORI;ISHII SABURO
分类号 E21D9/00;E21D9/01;(IPC1-7):E21D9/00 主分类号 E21D9/00
代理机构 代理人
主权项
地址