摘要 |
<p>PURPOSE:To enable the confirmation of the power-ON operation via the signal channel between a communication control processor and a power source control processor even when the communication control processor does not perform the communication control with a network by giving a power-ON instruction to a communication program for which down-loading is performed. CONSTITUTION:At the time of a site adjustment when a communication control processor 12 does not perform a communication control with a network, the instruction of power-ON is given by a test program after an IPL of the communication control program of an information processor is performed for a RAM 122. The communication control program which receives the instruction, stops a power source after the power-ON instruction is set at a prescribed location of an EEPROM 120. As a result, the communication control processor 12 is reset, a ROM 121 starts to operate, reads the prescribed location of the EEPROM 120, and instructs a power source control processor 11 to turning on the power source via a signalling channel 14 after the instructed timer time. Thus, the power-ON operation can be confirmed.</p> |