摘要 |
Together with the support (10), the sealing element (2) is lowered into a vertical ground slot (3). During lowering, the sealing element is rolled-off a drum (1) and secured to the frame of the support. Pref. the element is lowered by the support weight. The drum exerts a controllable resetting force onto the sealing element to be lowered into the ground slot. For the element lowering, a controllable force, opposing the resetting force and overcoming the resistance of filling material in the slot, is exerted onto the sealing element. USE/ADVANTAGE - Improved erection and film clamping for sealing wall.
|
申请人 |
BILFINGER + BERGER BAUAKTIENGESELLSCHAFT, 68165 MANNHEIM, DE |
发明人 |
HORN, WOLFGANG, DIPL.-ING., 4100 DUISBURG, DE;KRUBASIK, KLAUS, DIPL.-ING., 6702 BAD DUERKHEIM, DE;SEITZ, JOERN M., DIPL.-ING., 6915 DOSSENHEIM, DE;SIEFERMANN, JOSEF, 6840 LAMPERTHEIM, DE |