摘要 |
A method for monitoring the execution of tests on products (1) using a test system (2) and a central processing unit (4) comprising memories (5, 6), wherein the test is organized according to a time sequence, a system (2), operating modes, instruments (3) and conditions suitable for defining the test procedure (B); the test system (2), the products to be tested (1), and the measurement (3), acquisition (8) and storage (5) systems are configured, checked and approved in a test preparation phase (C); the test (D) is carried out while monitoring the parameters, all technical characteristics are determined, and the related data are stored; and the measured and stored data are processed (E), the measurements are selected and approved, and the results are generated. |