摘要 |
<p>PURPOSE:To eliminate risk of damaging a work due to shock at the time of elevating and sinking by performing installation till the final station with the first station while the work is mounted on the same dolly. CONSTITUTION:A dolly 1 is provided so that it travels along a line from the first station till the final station, and clamping jigs 40A-40C for locating and mounting a work on this dolly 1 and also works one another are installed on the dolly 1. Works are located and secured onto the dolly 1 one after another in the corresponding station using these clamping jigs, and meantime they are installed one by one on the same dolly 1 without being transferred at each station.</p> |