发明名称 OPERATION SYSTEM OF POWER SYSTEM
摘要 PURPOSE:To prepare a target system automatically by opening all switches surrounding a stop equipment given by a current system and subsequent power- system operation and extracting and closing another switch relieving a novel service interruption equipment-single system through a sound system. CONSTITUTION:When a transmission line 15 is given as a stop equipment, connection is tracked from the transmission line 15, switches 17, 18 are extracted as ones found for the first time, and these switches are opened on a current system. A novel service interruption equipment-single system is searched, and the transmission line 15 and a bus 4 are extracted as novel service interruption equipments, but the bus 4 is used as a novel stop equipment because the transmission line 15 is the stop equipment. Connection is tracked from the bus 4, a switch under an open state adjacent to a sound system charged by a large power supply 21 is searched, and the switch 6 and a disconnector 14 are extracted. A target system, in which the switch 6 is selected by a constraint on operation, the switch 6 is closed, the transmission line 15 is stopped and the service interruption equipment is minimized, is acquired.
申请公布号 JPH05292665(A) 申请公布日期 1993.11.05
申请号 JP19920115264 申请日期 1992.04.09
申请人 MITSUBISHI ELECTRIC CORP 发明人 OTANI JUNICHI
分类号 H02J3/00;H02J3/04 主分类号 H02J3/00
代理机构 代理人
主权项
地址