摘要 |
PURPOSE:To speedily and exactly attain the centralized data processing of each section, and to simplify the operation. CONSTITUTION:Intelligent boards 23-63 in which plural sensor are arranged like a matrix, are arranged at each section 20-60, and the computers of those boards are mutually on-line connected. A management chart with an operator name in a vertical axis, and a construction process in a horizontal axis, is prepared at the board, and a memory chip having data such as a name/date is adhered to each column of the chart. A sensor corresponding to each column of the chart stores a memory content with the adhered position data(operator name and construction process), and transmits the data to a computer 21 of the construction section 20. The computer 21 transmits the centralized-control data to computers 31-61 of each section in a real time. The transmitted data are displayed at displays 31a-61a of the computers receiving the data, and each person in charge can store the data by adhering a magnet sheet on the board according to the up-to-date data. |