PURPOSE:To sufficiently catch visually an overlap of a work, etc., and to improve the facility for forming a work load plan. CONSTITUTION:A date line table graph generating part 4 refers to the contents of a calendar part 3, and generates a day's program scale of all works, based on a work name stored in a work plan table store part 2 and a plan date of every work. The date line table graph generating part 4 generates a date line table graph of all works by plotting the plan date of every work to each corresponding date of the day's program scale, and connecting it with a designated kind of line at every work. A heaped load graph generating part 6 calculates a load value of every date from the date line table graph, the day's program scale, and a load coefficient of every work stored in a load coefficient store part 5, and displays the calculated load value on a heaped load graph. |