摘要 |
Maximum transmission line or conductor loading of an overhead transmission line or conductor spanning two transmission line towers is determined by using a sensing device clamped to the overhead transmission line. The sensing device acquires real-time information that is used in an iterative process to determine sag, limiting temperature, maximum current load and minimum clearance of the transmission line or conductor.
|