摘要 |
PURPOSE:To easily make a production plan with high reliability. CONSTITUTION:Order reception data, production progress condition data, design- classified man-hour master data, employment system data, process-classified and line-classified parameters are stored in an external storage device 4. The number of articles left unproduced in the object production process is calculated based on these data with respect to each production number (S10) and the daily production load man-hour is calculated (S11). Thereafter, the daily reference capability man-hour is calculated (S12) and the production load man-hour is calculated in accordance with the reference capability man-hour to calculate the excess man-hour (S13). Thereafter, the daily production load man-hour is displayed with numerical values and a bar graph and the daily reference capability man-hour is displayed with a polygonal graph (S15). This display is viewed to adjust the planned time limit of delivery, to change and adjust the production line and to adjust the personnel arrangement. |