发明名称
摘要 PURPOSE:To prevent a demand system from overdemand precisely by automatically stopping a previously set auxiliary machine simultaneously with system-down. CONSTITUTION:A central controller 5 collectively decides information sent from terminal control devices 4a-4d or that inputted through a keyboard to determine the auxiliary machines 2a-2d for the freezers/air conditioners to be interrupted and sends an interruption signal to the terminal control devices 4a-4d. If a demand controller 1 is failed, the controller 5 discriminates the failure and sends a forced stop signal to the terminal control devices 4a-4d for the auxiliary machines 2a-2d to be stopped at the trouble of the demand controller 1 set in the controller 5 through the keyboard.
申请公布号 JPH0531762(B2) 申请公布日期 1993.05.13
申请号 JP19840134590 申请日期 1984.06.27
申请人 MITSUBISHI ELECTRIC CORP 发明人 IGAWA HIROSHI
分类号 F24F11/02;F25B49/00;F25B49/02;G05F1/66;H02J3/00 主分类号 F24F11/02
代理机构 代理人
主权项
地址