摘要 |
1. The system for checking alternating current transformer, comprising two transformers, two balance indicators an adjustable voltage source and an admittance current divider with an inductive divider, consisting in that the initial terminal (ZP1) of the primary winding (UP1) of the first transformer (P1) is connected with the initial terminal (ZP2) of the primary winding (UP2) of the transformer (P2) and the mass of the system (M), whereas the initial terminal (ZW1) of the secondary winding (UW1) of the transformer (P1) and the initial terminal (ZW2) of the secondary winding (UW2) of the transformer (P2) are connected with the elements of the admittance current divider (ADP) the capacitor (C) and the resistor with conductance (G), and the unmarked terminal of the secondary winding (UW1) of the transformer (P1) is connected through the resistor (R1) with the mass of the system (M).<IMAGE>
|