摘要 |
Foundation anchor comprising an anchor body (1), a pile (stake) for driving (18), a pull cable (23) and a lateral shield (25). A first deployment of the shield (25) is ensured when the driving pile (18) is removed, because a boss (28) must leave a groove (20). Teeth (27) penetrate into the surrounding soil, which ensures complete deployment of the shield (25) when the cable (23) is pulled, then the tilting of the body (1). Application to foundation anchors of civil engineering constructions. <IMAGE>
|