摘要 |
The floor construction (1) has a bottom (3) and a base layer (2) also a top layer (4). The top layer is covered with sand (16) onto which a foil layer is applied. Tiles (7) are arranged on a resilient layer (6). The tiles are chamfered (8) to form recesses and have bottom grooves (9). The tiled area is enclosed by a plastics water guard (11). Floor construction includes a wall (12) and a column (13). Plant containers which are placed on the tiled surface, can be regularly flooded by water under low pressure, provided in gulleys (10). |