摘要 |
PURPOSE:To prepare a train operation system requiring the minimum energy consumption and maintaining the preset running time. CONSTITUTION:The target speed is set for each limit speed segment between stations (103, 110), the energy consumption and running time are calculated by simulation (104), the ratio of the reduction of the energy consumption against the increase of the running time is obtained (104), the target speed of the segment with the maximum ratio is decreased (110), and the processing is completed when the preset running time range is attained (107). Only the target speed is a variable to be determined, the target speed is to be just decreased from the maximum speed in the determination process, thus the combination of the optimum target speeds can be determined by a small quantity of calculation. |