摘要 |
<p>PURPOSE:To operate a train as scheduled through correction of a difference between the operation schedule and the actual running time of a train during a time in which a train is run to a target stop position without depending upon skill of a driver and causing problems of labor, safety, and passenger service. CONSTITUTION:A deviation time being a difference between a scheduled time predetermined according to the operation plane of a train 1 and the actual pass time of a train at predetermined spots 3a-3d is calculated during running of a train. Based on the deviation time, a restoration run curve pattern representing the running speed in a running position of the train is calculated. According to the restoration run curve pattern, the train is run.</p> |