Rope arrangement for an elevator comprising a hoisting machine (1,10,11) and hoisting ropes (3) moving the elevator car, in which rope arrangement the hoisting ropes (3) of the elevator run over rope pulleys (5a-5d) placed under the elevator car (8). The hoisting ropes (3) run over the rope pulleys so that the transmission ratio between the speed of the elevator car (8) and the rotational speed of the hoisting machine is at least 1:4. <IMAGE> |