摘要 |
PURPOSE:To achieve the smooth processing of a system by equalizing the transporting time of a mold from an injection molding process to each press unit in a pressure cooling process and/or the transporting time of a mold from each press unit in a pressure cooling process to a removing process in controlling the transporting time of the mold. CONSTITUTION:A traverser 10 is stopped in the condition wherein the pick-up conveyor 12 of the traverser 10 coincides with the transporting path 14 of a press machine. A central control disc 17 is memorized with the distance between a base point 13 and each press machine 18. The traverser 10 calculates the time from the base point 13 to each press machine 18 through the value and the speed of the traverser 10, and calculated is difference between the value and 30sec given by design as a time during the traverser 10 reaches from the base point 13 to each press machine 18. The value is forwarded as a waiting time information to the traverse device control unit 22, and the traverse device control unit 22 makes the traverse 10 wait during a predetermined period on the basis of the command. |