发明名称 Enhancing load-following and/or spectral shift capability in single-sparger natural circulation boiling water reactors.
摘要 <p>The present invention discloses an improved methodology for achieving the desirable feature of recirculation flow control in a sparger-type natural-circulation BWR, enabling reactors utilizing the method to perform in load-following and/or spectral shift modes of power operations. In its broadest aspects, the invention is based on locating the feedwater sparger (16) at an elevational level which is about water level (44) established during normal operation of the BWR. One or more of load following or spectral shift can be performed by controlling the feedwater fed to said BWR through the feedwater inlet and into the sparger to vary the water level to be above, at, or below the elevational level of such sparger. <IMAGE></p>
申请公布号 EP0487239(A1) 申请公布日期 1992.05.27
申请号 EP19910310452 申请日期 1991.11.13
申请人 GENERAL ELECTRIC COMPANY 发明人 OOSTERKAMP, WILLEM JAN
分类号 G21C7/26;G21C7/27;G21C7/32;G21D3/08;G21D3/12 主分类号 G21C7/26
代理机构 代理人
主权项
地址
您可能感兴趣的专利