摘要 |
A well completion system comprises production tubing (5) extending downhole from wellhead equipment (2) to a plurality of completion systems (7, 8, 9). A well testing facility comprising a test loop (26) with flow metering equipement (27) is included in the wellhead equipment. Each of a plurality of independently adjustable flow control means (57) is operable to stop the flow of fluid from a respective one of the completion assemblies into the production tubing. The downhole completion assemblies (7, 8, 9) are mounted on a common fluid and electrical supply means (4) comprising tubular electrical conductor means (42) and tubing (41, 45, 46) defining fluid paths.
|