发明名称 COMPLEX POWER SUPPLY METHOD IN COIL SUPPLY CARRIAGE
摘要 PURPOSE:To make a coil supply carriage free to approach the neighborhood of a mandrel by providing the coil supply carriage and a power supply carriage separably at the time of carrying a coiled thin steel belt wound up by the mandrel by the coil supply carriage, and by connecting both of them through a cable. CONSTITUTION:Pay-off reel(POR) mandrels 1, 2 are made to be a coil installation part to have a coil pass through a plate, and a coil supply carriage 4 and a power supply carriage 5 are provided free to travel along a rail 6 between the POR 1, 2 and a coil supply part. Additionally, a trolley wire to carry out power supply to drive the carriages along the rail 6, and the power supply carriage 5 is fitted with a collector ring to dispatch load to the carriage main body from a trolley of a trolley installation part 3. The coil supply carriage 4 is provided with a cable drum 7 a cyclone decelerator 8, and the coil supply carriage 4 is driven by them. Subsequently, the power supply carriage 5 is provided with a cable connection part to connect a trolley load collecting part 10 and a cable 11 of a cable reel drum 7.
申请公布号 JPH04146868(A) 申请公布日期 1992.05.20
申请号 JP19900269575 申请日期 1990.10.09
申请人 NIPPON STEEL CORP 发明人 SENO SATOSHI;KATSUMI TOSHIYUKI;SUEKI YUJI;SAWAI KIKUO
分类号 B61C3/00;B21C47/18;B60L5/00;B60L13/00 主分类号 B61C3/00
代理机构 代理人
主权项
地址