摘要 |
Method for making a loading station for lorries, comprising a loading pit with, above it, a loading bridge anchored in concrete. Two concrete, block-like elements are placed at the front of a floor which is located in front of a warehouse, on either side of the entry to the loading station. A so-called wide-slab floor, with a reinforcement projecting from the top, is placed on each of these elements, bridging the distance from the element to the rear wall of the loading pit. A second concrete floor, which adjoins the warehouse floor and on or in which the loading bridge is anchored, is poured onto this reinforcement. The invention also comprises the loading station constructed in this way.
|