摘要 |
PURPOSE:To perform labor saving and to shorten the schedule of estimation work by calculating the kind, the number, and the length of a cable by a cable calculation means and a work material calculation means, and calculating a work schedule and a work cost based on the result of above calculation by a work schedule calculation means and a cost calculation means. CONSTITUTION:A computer is equipped with an input device 1 which houses terminals 11, 12 to input information, a processor 2 equipped with an arrangement decision means 21, the cable calculation means 22, the workv material calculation means 23, the work schedule calculation means 24, and the work cost calculation means 25, a filling device 3 equipped with a work design reference file 31, a work material calculation file 32, a man-hour estimation file 33, a work cost file 34, a device constitution file 35, a drawing file 36, and an estimation result file 37, and an output device 4 which outputs an estimation list. The work cost can be calculated from the work schedule by calculating the kind, the number, and the length of the cable and calculating the required kind and number of work materials. In such a way, the labor saving can be attained, and the schedule of the estimation work can be shortened. |