发明名称 EXECUTION METHOD OF TUNNEL AND DEVICE THEREOF
摘要 PURPOSE:To make it possible to form a top wall at the same time as tunnels in parallel by excavating channel holes between opposite upper parts of both tunnels to fill the channel holes with concrete while excavating the tunnel standing in a row. CONSTITUTION:Circular cutter plates 3 and extra small cutter plates 16 of both sides of shield excavators 1 are rotated by driving motors 6 and 22. After that, a spreader 11a of a driving jack 11 is received at the front end of a segment lining (s), and the driving jack 11 is extended. Then, the ground is excavated by the cutter plates 3 and 16 to drive forward, and the same shaped circular tunnels in (t) in parallel and arch shaped channel holes (h) having the same shape as up and down channel hole formation frames 12 and 13 are excavated. Concrete is supplied to the channel holes (h) through a concrete pressure feed pipe 20, a pushing jack 18 is operated to tamp the concrete with a press member 19, and a top wall (a) and a bottom wall (b) are formed.
申请公布号 JPH03293497(A) 申请公布日期 1991.12.25
申请号 JP19900095295 申请日期 1990.04.11
申请人 OKUMURA CORP 发明人 NAKAGAWA MITSUGI
分类号 E21D9/087;E21D9/08;E21D11/00 主分类号 E21D9/087
代理机构 代理人
主权项
地址