发明名称 |
METHOD OF HEAT AND ELECTRICAL ENERGY SIMULTANEOUS PRODUCTION ESPECIALLY WITH INDUSTRIAL POWER PLANTS |
摘要 |
<p>During the season without heat demand a steam condenser (6) for the steam turbine (4) of the power plant has a heating capacity N when cooled by a cooling tower (7). During the heating season the condenser is operated at a higher temperature, as required for supplying heat to a consumer (9), but with the tower partially or completely disconnected. - The resultant reduction of the specific expansion and heating capacity of the turbine is compensated by increasing the steam parameters and steam output of a gas turbine exhaust heat recovery boiler (3) with supplementary combustion (11). Additional waste heat or industrial boilers may be incorporated or replace the gas turbine unit.</p> |
申请公布号 |
CS8500062(A2) |
申请公布日期 |
1991.12.17 |
申请号 |
CS19850000062 |
申请日期 |
1985.01.03 |
申请人 |
ENERGIAGAZDALKODASI INTEZET,HU |
发明人 |
PAPP ISTVAN,HU;BELCSAK ZOLTAN,HU;WENZEL BELA,HU;TAKACSY GEZA,HU;VADAS ZOLTAN,HU |
分类号 |
F01K23/10;F01K9/00;F01K17/02;H02P9/04;(IPC1-7):F02C6/18 |
主分类号 |
F01K23/10 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|