发明名称 BATH BOILER WITH HOT-WATER SUPPLY DEVICE
摘要 PURPOSE:To shorten the hot-water filling time period by a method wherein in the case a bath water level reference point judgement element stores a reference value, hot-water supply through a bath water supply pipe is continued when hot-water is supplied through the bath water supply pipe and 'Yes' is judged by a bath water supply pipe clogging judgement device, and hot-water including the amount of additional supply is supplied at a time when 'Yes' is judged by a bath water level inflection point judgment device. CONSTITUTION:In the case of the first time hot-water supply to a bathtub 21 without a stored water level reference value, that is, in the case of test operation, automatic hot-water supply is carried out in first time mode following an automatic hot-water supply sequence. After the first mode operation finishes, a bath water level reference point judgment device 41 judges that a water level reference value is stored. When 'Yes' is judged by a bath water supply pipe clogging judgment device 38 after an automatic hot-water supply switch 35 is turned on, and no clogging in the bath water supply pipe 19 is found, automatic hot-water supply through the bath water supply pipe 19 is continued as it is. At this time, as a two-way valve 31 is closed, a water level sensor 23 is allowed to detect the water level in a bathtub 21. As the output of the water level sensor 23 begins to increase when the water level in the bathtub 21 reaches a point where a bath water return pipe 22 of a bath adapter 20 is located, a bath water level transition point judgment device 40, which has a transition point where the water level rises by 10 bits (2.5cm as water level), for example, is provided.
申请公布号 JPH03181749(A) 申请公布日期 1991.08.07
申请号 JP19890321713 申请日期 1989.12.11
申请人 MATSUSHITA ELECTRIC IND CO LTD 发明人 KATAYAMA HITOSHI;HAMANO NOBUO;KONISHI MITSUNARI;YOKOAJIRO YOSHIYUKI
分类号 F24H1/00;F24D17/00;F24H1/46 主分类号 F24H1/00
代理机构 代理人
主权项
地址