摘要 |
<p>The coating layer (paint) (V) is first bombarded with gravel (G) or scratched and, in the second case, an adhesive tape is then stuck thereto and is intended to be removed to take away any areas (I, II) of the coating layer (V) which do not adhere adequately to the substrate. The surface morphology of the resulting material is analysed with the use of an image analyser. <IMAGE></p> |