发明名称 PORE PRESSURE PREDICTION METHOD
摘要 A method of predicting pore pressures at a proposed drilling location using Interval Transit Times derived from seismic data and Interval Transit Times from a calibrated normal geopressure trend. Seismic Interval Transit Times derived pore pressures and actual pore pressures derived from logs in a drilled well at an offset location are used to correlate graphically or analytically the seismic Interval Transit Times to normal geopressure interval transit times from a proposed drilling location to be used in the prediction of pore pressures at the proposed location.
申请公布号 WO9104500(A1) 申请公布日期 1991.04.04
申请号 WO1990US05263 申请日期 1990.09.20
申请人 CHEVRON RESEARCH & TECHNOLOGY COMPANY 发明人 WEAKLEY, ROBERT, R.
分类号 E21B21/08;E21B47/06;E21B49/00 主分类号 E21B21/08
代理机构 代理人
主权项
地址