发明名称 |
PORE PRESSURE PREDICTION METHOD |
摘要 |
A method of predicting pore pressures at a proposed drilling location using Interval Transit Times derived from seismic data and Interval Transit Times from a calibrated normal geopressure trend. Seismic Interval Transit Times derived pore pressures and actual pore pressures derived from logs in a drilled well at an offset location are used to correlate graphically or analytically the seismic Interval Transit Times to normal geopressure interval transit times from a proposed drilling location to be used in the prediction of pore pressures at the proposed location. |
申请公布号 |
WO9104500(A1) |
申请公布日期 |
1991.04.04 |
申请号 |
WO1990US05263 |
申请日期 |
1990.09.20 |
申请人 |
CHEVRON RESEARCH & TECHNOLOGY COMPANY |
发明人 |
WEAKLEY, ROBERT, R. |
分类号 |
E21B21/08;E21B47/06;E21B49/00 |
主分类号 |
E21B21/08 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|