摘要 |
<p>PURPOSE:To mount a flexible pipe on and remove it from a cable continuously and efficiently with light work by engaging a receiving edge of a guide rail with both cut end parts of a vertically split flexible pipe and pulling a grip part while holding it in the direction of opening part. CONSTITUTION:In the case of performing work of removing a cable C from a vertically split flexible pipe P, the cable C is set so as to penetrate diagonally from the right lower section to the left upper section in a groove 24 formed by an intermediate receiving part 34 and a spread end part 26 of a guide rail 12. While a grip part 16 is held, it is pulled in the direction of an opening part. Then both cut end parts of the flexible pipe P are engaged with the receiving edge of the spread guide rail 12 and enlarged further to provide a space, while the cable C, set through diagonally from the right lower section to the left upper section in the groove 24 with respect to the guide rail 12, is detached from the pipe with the end part being received in a cable receiving part 14 and while being pushed up obliquely leftward.</p> |