发明名称 CONSTRUCTION OF UNDERGROUND LINE
摘要 <p>PURPOSE:To eliminate manufacture and removal of inner frame plates and reduce man-hours on site by a method wherein stays and lines supported by them are built in a steel structure beforehand and concrete is placed to construct an underground concrete structure. CONSTITUTION:Lines 4 are attached to stays 3 which support the lines 4 by welding or the like. As the stays 3 and the lines 4 are built in a steel structure 7 beforehand, the steel structure 7 is manufactured in a factory or the like. The steel structure 7 manufactured like this is placed in an underground hole in which the structure 7 is to be installed with outer frame plates 5 between and then concrete is placed between the outer frame plates 5 and the steel structure 7 to construct an underground concrete structure 1 and the construction is finished.</p>
申请公布号 JPH0370409(A) 申请公布日期 1991.03.26
申请号 JP19890202868 申请日期 1989.08.07
申请人 MITSUBISHI HEAVY IND LTD 发明人 SETOGUCHI OSAMU
分类号 E02B9/06;E02F5/10;F16L1/038;H02G1/06;H02G9/08 主分类号 E02B9/06
代理机构 代理人
主权项
地址