摘要 |
Solid wastes, and wastes to be compacted, are pretreated for introduction into underground salt cavities or salt caverns via a downpipe under the force of gravity by a process in which solid, uncomminuted or comminuted or finely divided to very finely divided wastes are mixed with waste sludges in a ratio such that a material results from which moldings are produced, with or without the addition of a binder, in the form of granules, agglomerates or pellets by a granulation method, or in the form of flakes by a pressing method, the flakes being comminuted to give small moldings, and, if appropriate, the moldings are surface-dried or dried completely the moldings which are free-flowing under the force of gravity are then trickled into the salt cavity or into the salt cavern and form a pile therein until the said cavity or cavern is substantially full, and, if required, the salt cavity or the salt cavern is closed. |