摘要 |
A process for protecting nonstable or moderately stable, cohesionless to slightly cohesive geologic formations, in particular, in tunnel construction, in which drill holes are first made by boring into the formation and, following completion of the boring, the drilling rod is removed. During this removal a hardenable injection material is forced into the drill hole, whereby, using a drilling rod, a pointed rod or anchoring element is placed in position in the boring. This element remains in the boring during removal of the drilling rod, and is solidly connected to the formation by the injection material.
|