摘要 |
The present publication describes a process for producing a heat-interrupted prefabricated construction part 1 and a prefabricated heat-interruption part 2. The heat- interrupted construction part 1 is made by removing the non-hardened, moist concrete from the interruption site 5 and by placing in this space a steel frame 5 which absorbs the stresses directed against the beam 1. The required heat insulation 4 is disposed within the steel frame and the empty space 8 which is formed is refilled with concrete. The steel frame and the heat insulation can be produced directly at the interruption site 5 or can be fitted in place in the form of a prefabricated heat-interruption piece. <IMAGE> |