发明名称 SIMULATED LOAD CONTROLLER FOR POWER SYSTEM
摘要 PURPOSE:To make the simulation of a load controller high-speed by constituting a control operation block, which decides the quantity of required control and the control symmetry, and an accident detection block in separate blocks, and the providing the control operation block with generality. CONSTITUTION:A simulated loading device is divided into a control operation block A and an accident detection block B, and each output is input into a control designation output part. The accident detection block (the figure shows the case of two systems for power) executes accident detection logical operation cyclicly, and judges the operation of an accidental case being supposed in advance and outputs it. The control operation block A takes in tide, system capacity, and the controllable quantity into an information input part 1, and operates 1 the quantity requiring control, and operates 3 the quantity of control distribution, and judges 4 and outputs control symmetry. Hereby the control operation block A is given generality and wide use capability, whereby the simulation of the load controller is performed promptly.
申请公布号 JPH02241326(A) 申请公布日期 1990.09.26
申请号 JP19890058502 申请日期 1989.03.10
申请人 MITSUBISHI ELECTRIC CORP 发明人 KUROKAWA TAKAHISA
分类号 H02J3/00 主分类号 H02J3/00
代理机构 代理人
主权项
地址