摘要 |
PURPOSE:To attain the automatic reproduction of a load module LM that is required when a source module SM is updated due to the addition of functions, etc., by controlling the relationship among the SM, an object module OM corresponding to the SM, and the OM of each task type as well as the production times of the OM corresponding to the SM, the OM of each task type, and the LM respectively together with the final correction time of the SM. CONSTITUTION:An SM is compiled again and an OM group corresponding to the SM is linked again for production of an OM of each task type. Then the time tables are updated for production of the OM corresponding to the SM and production of the OM of each task type. An automatic task link means 13 refers to a task type-based OM production time table 6 and an LM production time table 7 after actuation of an automatic compiling/linking means 12 and decides the necessity or unnecessity for relink of tasks for each task type. When the relink is necessary, a task link 23 is started to link the tasks for the OM group of each task type. Thus an LM is produced and the table 7 is updated. As a result, the reproduction of the LM is automated.
|