摘要 |
<p>Process for the construction of walls of buildings, and/or work performed thereon, in particular, for floor installations, using a mobile lift (1) provided with at least one tool-carrying device (4) capable of being shifted above a construction area, characterized in that said lift is arranged so as to be supported, by means of its opposite ends, by two self-raising girders (2) located along and on the outer side of at least two opposite fronts of the building under construction, whereby the self-raising girders (2) constitute, in that fashion, the travelling or sliding tracks and the guiding tracks for said tool-carrying lift (1-4). The invention also concerns a device for the implementation of this process.</p> |