发明名称 TUNNEL EXCAVATION METHOD AND SHIELD EXCAVATION
摘要 PURPOSE:To excavate simultaneously a station tunnel and line tunnel by connecting a second shield excavator between first two shield excavators by which two subway line tunnels are excavated in parallel before the station. CONSTITUTION:First two shield excavators 1 with a smaller diameter by which two subway line tunnels are excavated and a second shield excavator 2 with a larger diameter to be placed between both of the first shield excavators, by which a station tunnel is excavated, are provided. Coupling blocks 3 to couple both of the first shield excavators 1 with the second shield excavator are provided. In the case the station is constructed, the second shield excavator 2 is inserted between the first two shield excavators 1, removable side sections of the bodies of the first shield excavators 1 are removed, and three units of shield machines are combined with coupling members 3 as a unit each other. According to the constitution, the station and line tunnels can be formed simultaneously and safety.
申请公布号 JPH02153196(A) 申请公布日期 1990.06.12
申请号 JP19880306284 申请日期 1988.12.03
申请人 RAILWAY TECHNICAL RES INST;TOYODA TOSHINORI;HITACHI ZOSEN CORP 发明人 KAWADA HIROYUKI;TOYODA TOSHINORI;NISHIDA SHOJI
分类号 E21D9/087;E21D9/08 主分类号 E21D9/087
代理机构 代理人
主权项
地址