摘要 PURPOSE:To shorten a construction period by a method wherein with a frame body stood on a periphery of an expected site, a crane is placed outside a site expected as a bridge pier, the crane is used to lift a hung frame, and a bridge is constructed while being supported by a pair of cranes between adjacent bridge piers after the piers are constructed. CONSTITUTION:A bridge 12 is extended between bridge piers 10, 10 formed by depositing concrete at the site to have the bridge pier 10 formed on a base in the ground, and as a frame body 16, four pillars 16a made of H-beams and beams 16b on the upper end are provided. With four screw rods 18 provided with a crane 17 placed on an outer side of the bridge 12, a frame for a bridge pier is placed on a working scaffold 20 at the lower end and a driver 24 is placed at the upper end. The bridge pier 10 is formed by repeating placement of a reinforcing bar 30 and concrete in the frame 22 to have a frame support 21 and a frame 34 mounted on a truss, and the bridge 12 is formed between the bridge piers 10, 10 by constructing placement of reinforcing bars and concrete. This establishes safety operation.
申请公布号 JPH0291307(A) 申请公布日期 1990.03.30
申请号 JP19880242551 申请日期 1988.09.29
申请人 OHBAYASHI CORP 发明人 WAKIYAMA TAKUO
分类号 E01D21/00;E01D2/00;E01D101/24 主分类号 E01D21/00
代理机构 代理人
主权项
地址