发明名称 METHOD FOR FORECASTING NATURAL GROUND FOR TUNNEL BEFOREHAND
摘要 PURPOSE:To cope with such as extrusion or sudden spring out of muddy water sufficiently, and to prevent such as delay in term of work owing thereto by investigating natural ground with use of a static cone when a tunnel is excavated. CONSTITUTION:A cone penetrometer 8 of a static cone 3 is pushed out before an excavating device 2 from inside of a partition wall 5 on a shield excavator 1, soil of a body to be excavated (such as hill-side) is investigated and cohesion, internal friction force and the like are known beforehand. The shield excavator 1 is then closed at a penetrated hole 11 on the partition wall 5 with a gate valve 12 before the cone penetrometer 8 is pushed out, and when the cone penetrometer 8 is pushed out, the gate valve 12 is opened, the penetrated hole 11 is opened and it becomes possible to pass through the cone penetrometer 8 and a rod 7. It is thus possible to foreknow soil conditions such as cohesion, internal friction force, weight per unit volume, groundwater level and pore water pressure before excavation.
申请公布号 JPH0274789(A) 申请公布日期 1990.03.14
申请号 JP19880226026 申请日期 1988.09.09
申请人 SHIMIZU CORP 发明人 WATANABE TOSHIO;MIYAZAWA KAZUO;ASO TOSHIMITSU;NISHIMURA SHINICHI;WAKI TOSHIO
分类号 E21D9/06 主分类号 E21D9/06
代理机构 代理人
主权项
地址