摘要 |
<p>PURPOSE:To enhance operating efficiency by using heating steam necessary for drying sludge by recovering the waste heat of a gas turbine engine by an exhaust boiler. CONSTITUTION:Heating steam is supplied by recovering the waste heat of a gas turbine engine 15 and, at the same time, power energy is obtained from a power generator 16 to be supplied to a sludge treatment part and the power demand of related equipments. The energy supplied to the gas turbine engine is used in the drying of sludge to be converted to power energy. By this method the reduction of treatment cost can be realized.</p> |