发明名称 DRIVING WORK OF STEEL PILE
摘要 <p>PURPOSE:To reduce noise with good efficiency by a method in which sound absorbers formed by attaching a visco-elastic material to a massive material at the joint face with steel pile are attached to steel pile at intervals in the longitudinal direction, and the steel pile is driven into the ground. CONSTITUTION:A visco-elastic material 4 of rubber or synthetic resin is attached to the inner surface of a mass material 3 consisting of a pair of halved steel rings to form a sound absorber 2. The sound absorbers 2 are attached to a steel pile 1 at a given interval by clamping the pile 1 put between the mass materials 3 by bolt and clamps 6. The pile 1 is driven into the ground, and the absorbers 2 are removed before they come into contact with the ground or sink into water for reuse for driving the next piles 1.</p>
申请公布号 JPH01142123(A) 申请公布日期 1989.06.05
申请号 JP19870299283 申请日期 1987.11.27
申请人 SUMITOMO METAL IND LTD 发明人 ANDO SEIJI;NISHIMURA SEIICHI;KOBAYASHI YOICHI;GOTO MASAYUKI
分类号 E02D13/00 主分类号 E02D13/00
代理机构 代理人
主权项
地址