发明名称 Cable-stayed bridge and construction process for such a bridge to replace a pre-existing bridge
摘要 The invention relates to a process for replacing a pre-existing bridge with a new bridge, this new bridge being of the "fan shaped cable-stayed" type, and to a bridge usable for carrying out this process. The new bridge is built with its deck 1 under the deck 8 of the old bridge. Preferably the new deck carries temporary roadways 13 on either side of the perpendicular of the old deck. After the new bridge is positioned, the deck 8 and the pylons 7 of the old bridge are destroyed and the deck 1 of the new bridge is then lifted in one piece up to the height of the deck of the old bridge. Interruptions to traffic are therefore reduced to short periods or even totally avoided. The bridge for carrying out this process comprises means of raising the top stay 15 which carries the cables 4 in relation to the pylon 2. At the same time, means are provided to raise the ends of the bridge in relation to its supports by acting on anchor ties. <IMAGE>
申请公布号 FR2619840(A1) 申请公布日期 1989.03.03
申请号 FR19870011889 申请日期 1987.08.25
申请人 MULLER INTERNATIONAL JEAN 发明人 JEAN MULLER
分类号 E01D19/14;E01D22/00 主分类号 E01D19/14
代理机构 代理人
主权项
地址