发明名称 METHOD FOR CHARGING RAW MATERIAL IN BLAST FURNACE
摘要 PURPOSE:To shorten charging time of raw material, to increase the iron production ratio and to stabilize the raw material piling condition in a furnace by controlling change of opening degree and opening speed of a large bell at each charge of divided raw material. CONSTITUTION:At the time of charging the raw material of ore, coke, etc., as dividing, the charging time of the raw material into the furnace from the large bell hopper 8 at each charge of the divided raw material, is found by vibration measured with a vibration detecting element 18 or impact force detected with a pressure detecting element 19. Further, the dropping track of the raw material is found from a pressure track detecting element 21 for measuring dropping track and piled raw material profile is found by a profile meter 22 as piled angle. Each measured data is inputted into a computing element 23 to calculate the opening degree and opening speed of the large bell for charging the next raw material. Based on the calculated opening degree signal, positioning control of the large bell is executed with a limit switch 14 arranging to the large bell rod 11, to adjust the opening degree. Further, the calculated opening degree signal is transmitted to an oil hydraulic device 15 for driving the large bell rod 11, to control the opening speed of the large bell.
申请公布号 JPS6421009(A) 申请公布日期 1989.01.24
申请号 JP19870177751 申请日期 1987.07.16
申请人 SUMITOMO METAL IND LTD 发明人 KAJIWARA YOSHIMASA;INADA TAKANOBU;TANAKA TSUTOMU;YAMAGATA CHISATO
分类号 C21B5/00;C21B7/18 主分类号 C21B5/00
代理机构 代理人
主权项
地址