发明名称 UPPER/LOWER LIMIT MONITORING SYSTEM FOR POWER SYSTEM
摘要 PURPOSE:To decrease the number of limit value data of facility to be employed for monitoring, by employing only inherent capacity of facility as the limit value of facility and monitoring the target value of total facility. CONSTITUTION:In a system where buses 1, 2 are connected through a plurality of power facilities 3-5, total power flow value is measured and total allowable value of the system is prepared, then they are compared in order to monitor overload. Furthermore, power flow flowing to remaining power facilities is predicted when power facility bearing the maximum power flow is interrupted. Total target value is set such that the predicted power flow does not exceed over the inherent capacity of any power facility, then the target value and the total power flow are compared in order to carry out monitoring. Consequently, number of data necessary for monitoring excessive power flow to the power facility can be decreased.
申请公布号 JPS63316625(A) 申请公布日期 1988.12.23
申请号 JP19870152841 申请日期 1987.06.19
申请人 TOKYO ELECTRIC POWER CO INC:THE;TOSHIBA CORP;HITACHI LTD;MITSUBISHI ELECTRIC CORP 发明人 KOMATA TAKAO;NISHIWAKI YOSHITAKE;HO MAMORU;GOTO UICHIRO
分类号 H02J3/00 主分类号 H02J3/00
代理机构 代理人
主权项
地址