发明名称 CONSTRUCTION WORK OF REINFORCED CONCRETE FOUNDATION FOR BUILDING
摘要 PURPOSE:To make easier the chipping operation of concrete by a method in which a cylinder of an expanded material is inserted into the upper iron bar portion of a concrete pile to cover the iron bar portion, and concrete is poured into the surrounding space of the covered portion. CONSTITUTION:A cylinder 2 of an expanded material is inserted into the upper iron bar portion 12 of a concrete pile 1 to cover the iron bar 12 portion, and concrete is poured into the surrounding space of the covered portion to cover the iron bar 12 portion with the concrete. In constructing the upper part of the foundation, the hardened concrete around the covered portion of the iron bars 12 is removed, and the cylinder 2 is removed to expose the iron bars 12 to outside. The presence of the cylinder 2 can prevent the direct adherence of concrete to the iron bars, and therefore, the need to remove the concrete from the iron bars 12 at the time of exposing work can be eliminated and the following work can be made easier.
申请公布号 JPS5991233(A) 申请公布日期 1984.05.25
申请号 JP19820200783 申请日期 1982.11.15
申请人 SEKISUI KASEIHIN KOGYO KK 发明人 TAKAHASHI YUKIO
分类号 E02D27/12;E02D5/34;E02D9/00 主分类号 E02D27/12
代理机构 代理人
主权项
地址