摘要 |
PURPOSE:To raise the safety of construction work as well as to improve the appearance of plant by a method in which slope frames are set on slope, reinforcing bars for other vertical frame are set in parallel with the inclined direction of the slope, vertical frames are constructed and horizontal frames are formed, then soil is placed. CONSTITUTION:A net 3 is laid on the whole surface of a slope 2, slope frames 1 are set on the net 3, and the uppermost net 11 is set in the direction of crossing the inclined direction of the slope 2. Reinforcing bars 4 for vertical frame are set in parallel with the inclined direction of the slope 2 and cement mortar is sprayed to construct the vertical frame 5. Horizontal frames 6 crossing the frames 5 are constructed, and soil 7 is placed on the net 3. Operations can thus be made in safe environment without devastating the surface of slope.
|