发明名称 CONSTRUCTION WORK OF IN-SITU PILE
摘要 PURPOSE:To exactly prevent the degradation of pile wall by a method in which bearing layer is improved to form gel blocks, the gel block is pulled up with an earth auger, a stabilizer solution is injected, and the earth auger is again inserted and pit wall is stabilized to form a pile. CONSTITUTION:An earth auger 1 is turned to improve the bearing layer 18 and pulled up with a gel block 10. A bentonite solution 11 is injected from the end of the shaft 2 of the auger 1, the auger 1 is again inserted into the pit, and the wall of the pit 8 is treated by a trowel. A reinforcing bar cage 13 is then set in the pit 8, and a tremie tube 14 is penetrated to place ready- mixed concrete 15. A good shape of concrete pile can thus be formed, and slime can also be effectively removed.
申请公布号 JPS63197717(A) 申请公布日期 1988.08.16
申请号 JP19870029158 申请日期 1987.02.09
申请人 KAJIMA CORP 发明人 NOJIRI AKIYOSHI
分类号 E02D5/44;E02D5/46;E02D7/00 主分类号 E02D5/44