摘要 |
PURPOSE:To obtain an economical ground-improving construction, by fitting sheet members mounted on soft ground, on the upper ends of a plurality of vertical earth anchor units erected with the lower ends fixed at the lower layer of hard ground, and by pressure-energizing the sheet members. CONSTITUTION:The lower ends of a plurality of vertical earth anchor units 4, 4 are fixed at the hard ground 3 of the lower layer of soft ground 2, and the anchor units are erected. After that, in the soft ground 2, at intervals, vertical drain columns 5, 5 are arranged and a permeable layer 6 is formed on the soft ground 2. After that, on the permeable layer 6, sheet members 1 are mounted, and the head sections of the vertical earth anchor units 4, 4 are penetrated through. After that, via compression coil springs 8, the anchor units are fastened with nuts 10 to press the soft ground 2. Then, as the consolidation of the soft ground 2 is promoted and the elongation of the vertical earth anchor units 4, 4 is relieved, the anchor units are gradually fastened to continuously press the subsoil 2.
|