摘要 |
PURPOSE:To shorten a die change time so sharply, by turning a molding over by a width adjustable turn arm, receiving it with a width adjustable skid, and conveying it to a delivery position at the next stage with a belt conveyor being free of width and height adjustments. CONSTITUTION:After the molding 2 formed in a press 1 at the previous stage is turned over by a width adjustable turn arm 9, it is received by a width adjustable skid 18 according to a molding 1, and furthermore this molding is conveyed to a delivery position of a conveying device taking the molding 2 into a press at the next stage by a belt conveyor 19 being free of width and height adjustments according to size and form of the molding 1. Therefore, even if the size and form of the molding 2 are varied, adjustment of an interval between the conveying device and the turn arm 9 is automatically performable. In consequence, the arrangement work required for hours in the past can be done in a short time, thus a die changing time in a press line is sharply reducible.
|