摘要 |
PURPOSE:To perform automatic operation control by providing a manual switch for resetting power-off information in an automatic controller, and resetting an operation storage part with the manual switch when trouble is removed and enabling automatic power-on operation using a power-on reservation timer. CONSTITUTION:When power-off information originating from trouble is inputted to a control part 14 through a bus 41, the control part 14 stores it in a storage part 12. If the trouble is removed until automatic power-on operation is performed wit the power-on reservation timer 13, the depression of the operation storage resetting switch 15 by an operator applies an operation storage reset request to the control part 14 through a signal line 47 and the storage part 12 resets the power-off information through a bus 42. When a timer 13 reaches set time after the resetting, a power-on request is sent to the control part 14 through a signal line 44 and an on/off mechanism 20 powers on individual devices of a controlled system 30 through a signal line 46. |